RadianceAdvisory
05 · Insights

Ideas and analysis for better solar decisions

Practical writing from field assignments, technical reviews, and program design work. Intended for institutional teams making real procurement, implementation, and investment decisions.

KNOWLEDGE GRAPH · INSIGHT TOPICSField practiceProcurementM & EDiligenceMaintenanceProgramsLessons
Fig · Topic graph across recent writing
Category
Featured · Guidance Notes
HealthSizingProcurement

Solar for Health Facilities: A Practical Planning Guide

What planners, donors, and ministries get wrong about sizing solar for clinics and hospitals — and a field-tested framework to get it right the first time.

  • 01Most clinic solar systems are sized on nameplate equipment loads, not measured consumption. Result: 40–60% oversize on PV, 25% undersize on autonomy.
  • 02Cold chain and theatre loads dictate autonomy days, not daily kWh. Plan for the worst 72 hours, not the average day.
  • 03Procurement must bundle PV + storage + 3 years of O&M into a single performance contract; unbundled tenders fail within 18 months.
Mar 2025·9 min read·Read article →
Lessons Learned
Feb 2025

Why Solar Projects Fail After Installation

Post-mortems from 60 failed or underperforming installations point to four recurring causes — none of them technical.

7 min read·O&MGovernanceProcurement
Read article →
Technical Briefs
Feb 2025

Designing M&E Systems for Off-Grid Public Infrastructure

Monitoring is the cheapest insurance an off-grid program can buy — yet most programs ship without it. A reference architecture for hardware, telemetry, and accountability.

11 min read·M&ETelemetryArchitecture
Read article →
Market Insights
Jan 2025

Procurement Risks in Donor-Funded Solar Programs

A pattern analysis of 24 donor-funded solar tenders across East Africa and the Sahel — and the structural choices that quietly shape outcomes years later.

8 min read·ProcurementDonorsRisk
Read article →
Field Notes
Jan 2025

What Feasibility Studies Often Miss in Fragile Contexts

The technical content of a feasibility study is usually adequate. The contextual content — security, logistics, institutional continuity — is usually decorative.

6 min read·FeasibilityFragile contexts
Read article →
Technical Briefs
Dec 2024

Solar Water Pumping in Sudan: Design and Maintenance Considerations

Solar water pumping is the most cost-effective off-grid water solution in Sudan when designed for local conditions — and the most expensive when it is not.

10 min read·WaterPumpingSudan
Read article →
Guidance Notes
Dec 2024

From EPC Delivery to Program Assurance: A Better Model for Solar Scale-Up

EPC contracting delivers individual installations. It does not deliver programs. At scale, the gap shows up as a long tail of underperforming sites no one can fix.

8 min read·ProgramsEPCAssurance
Read article →
Guidance Notes
Nov 2024

How to Evaluate Solar EPC Bids Beyond the Lowest Price

A practical scoring framework that has been used on tenders ranging from a single clinic to a 180-site portfolio.

7 min read·ProcurementEPCEvaluation
Read article →
Technical Briefs
Nov 2024

Battery Autonomy, Maintenance, and Real-World Reliability

Datasheet cycle life is a marketing number. Real cycle life in Sudan conditions is 40–60% of nameplate. Design accordingly.

9 min read·BatteriesReliabilityDesign
Read article →
Lessons Learned
Oct 2024

Building Solar Programs That Can Survive Field Conditions

What we have learned, in plain language, from designing and assuring solar programs in places where the easy choices do not work.

8 min read·ProgramsFieldSudan
Read article →
— Engagement

Let's build reliable, sustainable solar solutions together.

Partner with Radiance Advisory for independent, high-quality advice that strengthens programs and delivers measurable impact.